| Project: | Construction of North West PATH Pedestrian Tunnel from Union Station to 1 University Ave. The North West PATH is a pedestrian tunnel travelling from the north west corner of Union Station to the north west side of the intersection of York St and Front St. The tunnel consists of a cut and cover cast-in-place reinforced concrete tunnel structure with architectural finishes, and mechanical and electrical services. The tunnel terminates at street level with a glass elevator and stair enclosure. Work will also include support of excavation, traffic control, removal and/or relocation of utilities, installation of new utilities, and reconstruction of the road allowance. Utilities affected include but not limited to sewers, watermains, street lighting, traffic signals, Toronto Hydro, Hydro-One, Bell, Enbridge, Rogers, Cogeco, Telus, Group Telecom, and TeraSpan. |
| Development: | Engineering |
| Category: | Tunnels, subways; Roads; Sewers & Watermains; Elect power, engineering |
| Owner | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Gen cont | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Consultant | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Bid Results | |
| Carillion Canada Inc, 7077 Keele St 4th Flr, Concord ON L4K 0B6, Phone: 905-532-5200, Fax: 905-532-5299 | $34,855,090 |
| Bondfield Construction Co Ltd, 407 Basaltic Rd, Concord ON L4K 4W8, Phone: 416-667-8422, Fax: 416-667-8462 | $39,648,888 |
| Belor Const, 6625 Kitimat Rd, Unit 46, Mississauga ON L5N 6J1, Phone: 905-858-7666, Fax: 905-858-7789 | $41,042,457 |