| Note: | Request for Proposals have been evaluated and the civil engineering firm has been awarded. Engineering design is anticipated to proceed throughout 2013. Further update fall 2013. |
| Project: | proposed improvements include an outfall made up of three 10-foot diameter pipes that will be built into a 3.5 km span from an additional effluent pumping station. Sodium disulfides and dechlorination have been chosen as the preferred options for the bypass disinfection system. |