ENERGY GENERATING FACILITY Proj: 9142680-5
Marmora and Lake Twp, Hastings Co ON CONTEMPLATED
Marmora Pump Storage, Township of Stirling-Rawdon
$660,000,000 est
Note: This project is preliminary. Design, tender and construction timelines are undetermined at this time. Further update fall 2013.
Project:proposed conversion of the Marmora Mine property into a 400 megawatt pumped storage facility. Pumped storage stores and generates electricity by pumping water into an upper reservoir when energy demand and rates are low and then allows it to flow down through the same pump/generator system to generate electricity when it is needed by the grid.
Development:Engineering
Category:Elect power, building; Warehouse, storage bldgs
Owner Complete information is available to subscribers. Click HERE to find out how to subscribe.
First report Mon Aug 29, 2011. Last report Fri Dec 28, 2012.
This report Tue May 14, 2013.