| Note: | Owner has cancelled the request for proposals from engineering professional consulting firms (6805-12-FE05) and will not proceed with the project - a special addendum has been published. Coverage of this report has been discontinued. |
| Project: | proposed repairs to the Dubuc bridge, adjacent structures and their approaches on the roads 172 and 175 above the Saguenay River. The scope of the project includes structural works, traffic signalization and signalization works, earthworks, lighting works, traffic maintaining, environmental protection and landscaping. |
| Development: | Engineering |
| Category: | Bridges; Roads; Misc engineering |
| Owner | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|