June 27, 2012
Ontario Ministry of Labour inspectors visited Elliot Lake mall six times before collapse
TORONTO

The Elliott Lake mall whose roof collapsed, killing at least one person, had a history of complaints about leaks and mould going back years, according to information from the Ontario Ministry of Labour.
The ministry paid six visits to the Algo Shopping Centre over the last three years, most of which related to complaints about reported leaky pipes, a leaky roof, mould, and an unsafe escalator, an official said.
Matt Blajer, a spokesman for the ministry, also confirmed in an email that there was no construction taking place on the site at the time of the roof's collapse.
The most recent visit was Jan. 11 in response to a complaint of a leaky roof, but no orders were issued, the ministry said.
Eastwood Mall Inc., the company that owns the mall, provided information regarding ongoing maintenance planned “and a permanent fix for spring/summer 2012,” Blajer wrote in an email.
He said officials also paid a visit to the site four other times between November 2010 and August 2011 to follow up on other complaints, but didn't find anything related to the complaints that violated the Occupational Health and Safety Act.
On Nov. 17, 2010, an inspector visited the site after receiving a complaint there were leaking pipes in mall offices. The plumbing staff were on site replacing the entire piping system, the ministry said.
The ministry said it followed up in January and found that Eastwood Mall had complied with the orders and the plumbing was replaced.
The ministry said an inspector returned on June 1, 2011, after it received a complaint that there was a leaky roof, mould and an unsafe escalator. The inspector found no violations related to the complaint, but issued two orders related to the training of workers handling hazardous material and the reporting of the materials.
Again, Eastwood Mall complied with the directives and no further orders were issued, the ministry said. Back in 2009, the ministry issued a stop work order related to the use of a skyjack lifting device to paint structural beams outside the mall. It ordered that the company to provide proper training on the use of the equipment.
One source with Eastwood Mall Inc, which owns the mall, has said the two-storey centre underwent a structural study in May and received a passing grade.
Work was being done on the roof before the collapse to prevent leaks, but no “substantial renovations” were underway, the source said.
Work to re-seal the surface of the roof was, however, planned for the near future.
At the local government level, the mall's owner raised concerns more than a year ago about a loss of tenants.
Owner Richard Nazarian appealed to Elliott Lake's economic development advisory committee for help during their May 11, 2011 meeting.
According to the minutes of the meeting obtained from the city's website, Nazarian told the committee the mall “is not at its best.”
“The mall is suffering because of a loss of tenants,” the minutes state.
“The mall is suffering because of a loss of tenants,” the minutes state.
The minutes also said Nazarian “is looking for help and is open to suggestions.”
Nazarian also discussed his plans for a new parking lot and possibly purchasing land from the city to facilitate it.
“He is looking for ideas/suggestions to turn the 80 room hotel into an income property,” the minutes say.
“The chair advised Mr. Nazarian that we are an advisory committee. She then provided him with one of the proposals that was put forward by a member respecting the Algo Mall.”
The minutes of the meeting don't say what the proposal was.
The Algo Mall was also discussed by the city's economic development committee a month earlier, according to their minutes. Both committees attended the meeting, where several suggestions and ideas were brought forward. But the discussion was deferred to a future meeting of the advisory committee.
Some residents in Elliott Lake have said that the mall, which was built in the 80s, was in need of repairs.
Nazarian, the mall owner, and his son Levon travelled to the city soon after the incident to offer support to the community.
“We are, and will be co-operating with the authorities to provide them with any helpful resources that are at our disposal,” Levon Nazarian said on June 24.
News from © Canadian Press Enterprises Inc., 2012
| MOST POPULAR STORIES |
- OPG $1 billion proposal to bury nuclear waste up for comment
- Hundreds of workers to be out of work as Caterpillar Inc. is set to close Toronto factory
- Ontario prompt payment bill to get second reading today
- Proposed Ambassador Bridge twinning draws Windsor mayor’s ire
- Construction on pedestrian tunnel to Billy Bishop Airport continues to make progress
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 316 projects with a total value of $2,787,806,637 that Reed Construction Data Building Reports reported on Friday.
SENIORS CONDOMINIUM APARTMENT & OFFICE BLDG
$90,000,000 Richmond Hill ON Prebid
$82,000,000 White River Twp ON Tenders
CONDOMINIUM APARTMENT BUILDING
$40,650,000 Markham ON Prebid
| CURRENT STORIES |
- VIDEO: Competing in the trades
- Multi-employer approach needed in apprenticeships
- New Perspective
- ACEC’s input helps develop global engineering guidelines
- Clerk of works position gives peace of mind on projects
- World Trade Center developer’s plan for a 926-foot tower moving ahead
- Call for action after MOL says workers are responsible for their own safety
- Cold spring and weak construction hurt Deere’s 2013 predictions
- CanBIM reschedule June session
- More green roofs top Toronto buildings
- Witness recants testimony in Montreal corruption case
- Construction Site Arson
- Journal of Commerce Update for the week of May 20th, 2013
- Industry reacts to surprise B.C. Liberal majority
- Calgary Airport Tunnel
- Worker at centre of union sign up allegations speaks out
- Calgary program aims to get more people into the trades
- Midrise in the City
- Veterans battle barriers into the trades
- Government makes changes to online tendering
- SNC-Lavalin maintains that new bribery allegations have been resolved
- B.C. faces a tough battle for top talent
- Keyano College building state of the art training facility
- Essential skills can play a vital role in an apprentices' success
- Taking a closer look at the risks in green building for contractors
- Colleges conduct construction research in addition to teaching
- Skills Canada BC Competition
- Lower Mainland high school trades program is unique
- Construction Learning Forum aims to educate
- High schools looking for more industry participation
- Industrial construction supervisor program takes off
- Saskatchewan bill passed
- Edmonton garners support for regional cash for arena
- Feds pledge $5 million for Vimy memorial
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- An Overview of Prices and Sales in the Diverging U.S. and Canadian Housing Markets (April 25, 2013)
- Canada’s Precarious Dependence on the Commodity Price Super-Cycle (April 22, 2013)
- Twenty major upcoming residential and transportation terminal construction projects - April 2013 (April 15, 2013)
- More