LATEST NEWS
Trade Contracting | Building Envelope | Steel | Concrete | Skills Training | Green Building | Heavy Equipment
June 22, 2012
Project progress
EllisDon works on exterior of Hospital for Sick Children Research Institute in Toronto
WILLIAM CONWAY/PROGRESS PHOTOGRAPHY
Exterior work gets closer to the top floor on the Hospital for Sick Children Research Institute in Toronto, Ont.
EllisDon Corp. is general contractor of the 21-storey facility that has been designed to meet LEED Gold certification. The building will be equipped with research labs, education and conference space, retail space and three levels of underground parking. The project was designed by Diamond Schmitt Architects Inc./HDR Architecture and consultants are: Halcrow Yolles, a CH2M Hill company (structural); H.H. Angus and Associates Ltd. (mechanical/electrical); and du Toit Allsopp Hillier (landscape).
Subtrades include: York Excavating and Grading Co. Ltd.; Deep Foundations Contractors Inc.; Mometal Structures Inc. (structural steel); C & T Reinforcing Steel Co. (1987) Ltd.; Avenue Building Corp.; Limen Masonry; North Wood Carpet & Tile; The Belluz Group (tile); Select Drywall & Acoustics; Comstock Canada (mechanical); Blandford (spray insulation); Ontario Electrical Construction Co.; Paul & Douglas Sprinklers (fire protection); Fisher Hamilton (lab casework); City Wide Door and Hardware; Rainbow Waterproofing; Triumph Aluminum & Sheet Metal (roofing); Gage Metal Cladding; Sota Glazing and Otis Canada Inc. (elevators).
| MOST POPULAR STORIES |
- PCL Constructors works on Humber River Regional Hospital in Toronto
- Tower Hill unveils 56-storey condo tower project
- Hundreds of workers to be out of work as Caterpillar Inc. is set to close Toronto factory
- OPG $1 billion proposal to bury nuclear waste up for comment
- London association withdraws from COCA
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 316 projects with a total value of $2,787,806,637 that Reed Construction Data Building Reports reported on Friday.
SENIORS CONDOMINIUM APARTMENT & OFFICE BLDG
$90,000,000 Richmond Hill ON Prebid
$82,000,000 White River Twp ON Tenders
CONDOMINIUM APARTMENT BUILDING
$40,650,000 Markham ON Prebid
| CURRENT STORIES |
- VIDEO: Competing in the trades
- Provinces need to loosen up apprenticeship rules
- Way Up on Westwood
- Building Up On Bayview
- Barrie Construction Association rolls with motorcycle ride for cancer
- Vimy Ridge memorial gets new visitor centre
- Minnesota Vikings unveil new multi-use stadium plan
- Proposed Ambassador Bridge twinning draws Windsor mayor’s ire
- Construction on pedestrian tunnel to Billy Bishop Airport continues to make progress
- Construction Site Arson
- Journal of Commerce Update for the week of May 20th, 2013
- Industry reacts to surprise B.C. Liberal majority
- Calgary Airport Tunnel
- Worker at centre of union sign up allegations speaks out
- Calgary program aims to get more people into the trades
- Midrise in the City
- Veterans battle barriers into the trades
- Government makes changes to online tendering
- SNC-Lavalin maintains that new bribery allegations have been resolved
- B.C. faces a tough battle for top talent
- Keyano College building state of the art training facility
- Essential skills can play a vital role in an apprentices' success
- Taking a closer look at the risks in green building for contractors
- Colleges conduct construction research in addition to teaching
- Skills Canada BC Competition
- Lower Mainland high school trades program is unique
- Construction Learning Forum aims to educate
- High schools looking for more industry participation
- Industrial construction supervisor program takes off
- Saskatchewan bill passed
- Edmonton garners support for regional cash for arena
- Feds pledge $5 million for Vimy memorial
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- An Overview of Prices and Sales in the Diverging U.S. and Canadian Housing Markets (April 25, 2013)
- Canada’s Precarious Dependence on the Commodity Price Super-Cycle (April 22, 2013)
- Twenty major upcoming residential and transportation terminal construction projects - April 2013 (April 15, 2013)
- More








