July 21, 2010
Modular manufacturer Winalta Inc. granted creditor protection
RICHARD GILBERT
staff writer
EDMONTON
Modular home manufacturer Winalta Inc. was granted its second extension of creditor protection earlier this month to develop a restructuring plan. The Court of Queen’s Bench of Alberta, Judicial Centre of Edmonton granted the extension until Aug. 6
under the Companies’ Creditors Arrangement Act (Canada) (CCAA).
The court has approved the sale of 29 homes and lots plus three vacant lots in Sylvan Lake, Alberta.
As a result of this sale, Winalta will receive more than $3.8 million.
The completion of this transaction is expected this month.
The court also approved the sale of 118 acres of residential property in Estevan, Saskatchewan.
From this sale, Winalta will receive $1.6 million.
The transaction is expected later this month.
The court has additionally granted Winalta an order relieving it of its obligation to hold an annual meeting of its shareholders within the time prescribed by the Business Corporations Act (Alberta), until the court orders the annual meeting to be called.
On April 26, Winalta applied for and obtained its first order from the Courts granting creditor protection under the CCAA.
The company has consulted with its primary lender and continues to work to reduce its debt and fund operations by attempting to sell its non-core assets.
Interim financial results have been prepared on a going concern basis, which assumes that the future operations will allow for the realization of assets and discharge of liabilities in the normal course of business.
In the second quarter of 2010, Winalta had a net loss of $5.2 million.
| MOST POPULAR STORIES |
- Four companies short-listed to renovate London, Ontario hospital
- General Electric steps up participation in new wind projects
- Fanshawe College’s new Centre for Applied Transportation Technologies goes green
- Electrical industry welcomes Ontario’s creation of standalone energy ministry
- TransCanada begins construction on Alberta-British Columbia pipeline
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 338 projects with a total value of $1,555,870,391 that Reed Construction Data Building Reports reported on yesterday.
$119,200,000 Innisfil ON Negotiated
INDUSTRIAL, WAREHOUSE, OFFICE, COMMERCIAL DEV
$100,000,000 Toronto ON Prebid
$93,000,000 Hawkesbury ON Prebid
| CURRENT STORIES |
- Contractors race to meet infrastructure stimulus deadline
- Tridel continues construction on Reve King West condos in Toronto
- Sustainability, heritage buildings hard to combine
- EllisDon continues work on 18 York Street office building in Toronto
- Stantec to provide engeineering services for Samsung Grand renewable energy park
- Industry jobs promised by campaigning New Brunswick premier
- July sees drop in U.S. construction spending
- Nabucco gas pipeline gains support in Europe
- Options being considered for new Pattullo Bridge in Metro Vancouver
- Car plows into Vancouver construction site
- Traffic control workers form B.C. Flagging Association
- British Columbia’s first six-storey wood structure takes shape
- Bird Construction begins work on new ice rink in Vancouver
- Northern infrastructure vulnerable to climate change effects: report
- ECO:LOGIC Engineering designs iPad construction software
- WorkSafeBC sets new assessment rates
- Cement ‘sniffing’ technology could help find Jimmy Hoffa
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- For Canada, the longer-term outlook is largely about commodities (September 2, 2010)
- Canada’s construction starts in a transition phase (August 27, 2010)
- U.S. initial jobless claims rise to half a million again (August 19, 2010)
- More










