LATEST NEWS
Green Building | Trade Contracting | Concrete | Building Envelope | Water & Wastewater
November 3, 2009
MICHAEL LALICH
The new state-of-the-art Engineering Technology Building.
Projects
Engineering building will be the ‘face of McMaster University‘ in Hamilton, Ontario
There’s a new face on Main Street West in Hamilton: the $48 million Engineering Technology Building at McMaster University. The five-storey, 125,000-square-foot, glass-covered building features state-of-the art learning and research facilities, sustainability systems and novel architectural design.
It will house more than 2,000 students, professors, researchers and staff.
“This new building is going to represent the face of McMaster for the 21st century,” said Peter George, the university’s president and vice-chancellor.
“It is a showcase of the very best McMaster has to offer in terms of the programs it represents and because of the partnerships and collaborations that made it possible.
“It is a real symbol of the economic renewal of our community and of our leadership in this community and beyond.”
The building, designed by VermeulenHind Architects and constructed by Bird Construction Co., is the new home of the McMaster-Mohawk Bachelor of Technology Partnership, the first-year engineering program, the McMaster School of Biomedical Engineering, the Walter G. Booth School of Engineering Practice, a new Biointerfaces Institute and the Centre for Research in Micro and Nano Systems.
“This building is representative of the new era unfolding in the faculty and for the engineering profession,” said David Wilkinson, dean, faculty of engineering. “The facilities and layout encourage interaction among students and professors. And the programs here are opening up new frontiers in teaching, engineering and society.”
The project team included structural engineering consultants Halcrow Yolles, mechanical and electrical consultants Vanderwesten Rutherford and Mantecon, sustainability and LEED consultant Enermodal Engineering and landscape architects Fleisher Ridout Partnership.
Bird acted as construction manager on the project, which was designed to achieve LEED Gold certification.
Sustainability features include: rain water harvesting for wastewater flushing and landscape irrigation; occupancy and automated photo sensor controlled lighting; high recycled content in primary materials; inclusion of local slag to reduce cement content in structural and landscaping concrete; dual duct HVAC system that separates ventilation from space heating and cooling functions, coupled with heat recovery for exhaust air; and integration of mechanical systems with the building envelope and structure, incorporating the thermal mass of the structure as a heat sink.
McMaster said these features contribute to the building-as-a-learning-tool design. Structural and mechanical elements throughout the building have been left open to allow students to view its construction and operation.
Classrooms feature digital projection, wireless Internet, occupancy-based lighting, and advanced ventilation systems.
The building has also been designed to enhance the teaching and learning process.
This is achieved through the inclusion of separate teaching studios, tutorial rooms and study space that encourages collaboration and the open exchange of ideas and information. Classrooms also feature state-of-the-art technology including digital projection and wireless Internet.
Of note are two elliptical classrooms on the building’s basement and main floors. These rooms are contained within a unique architectural feature of the building: a three-storey, funnel-shaped tower on the building’s west facade.
The elliptical classroom is one of only a few in North America. Its shape facilitates interaction between teacher and students, and among students.
The lab on the main floor will be used for teaching engineering design and graphics and engineering computation. The outer ring of student seats is raised to allow the teacher to see and be seen by all. The lab contains 55 computer work stations and 28 instruction monitors displaying a video signal from the instructor. The video signal can display slides, images from a document camera or images drawn with a special pen.
Instructors are able to project directly on the students’ displays for demonstration purposes.
The use of a client-server model and thin-client technology makes the system more resource efficient and environmentally friendly.
Several artistic pieces will also be featured in the building, each with an engineering theme. These include:
| MOST POPULAR STORIES |
- What comes next after green building?
- Drummond report on Ontario public service recommends full cost pricing for municipal water
- Toronto Construction Association presents ‘Best of the Best’ awards
- Losing bidder bridles at Pan Am Games park selection, Equine Canada “thrilled”
- Steel truss system helps reduce construction cost of Toronto apartment building
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 311 projects with a total value of $2,942,388,900 that Reed Construction Data Building Reports reported on Wednesday.
$800,000,000 Etobicoke ON Negotiated
$300,000,000 Markham ON Prebid
TOWNHOUSE & RETAIL DEVELOPMENT
$100,000,000 Brampton ON Prebid
| CURRENT STORIES |
- Drummond report suggests expanded role for Ontario College of Trades
- Drummond report recommends changes to infrastructure asset reporting in Ontario public service
- Drummond report on Ontario public service recommends full cost pricing for municipal water
- Lawyer Geza Banfai receives Toronto Construction Association award
- Accel continues construction on Art Condominiums in Toronto
- Apprenticeship ratios stifle competition in construction: Progressive Contractors Association of Canada
- SaskTel enhances Internet service for Saskatchewan First Nations communities
- Quebec government sues firms over Montreal highway tunnel concrete collapse
- ACEC meets with Canadian prime minister
- Les Architectes FABG to design $16-million Montreal theatre
- VIDEO: Buildex Vancouver Construction Keynote Panel
- Work on Port Mann bridge delayed after crane mishap
- Alberta budget scales back slightly on infrastructure spending
- SNC Lavalin parts ways with two execs after published report of internal turmoil
- Vancouver Island Construction Association turns 100
- A look at being fair, open and transparent
- PHOTO GALLERY: Merit Alberta open house
- Construction industry employment experiences another month of decline
- What a Dummy
- Ruskin Construction gets $3.3 million bridge contract
- Residents return after gas line strike
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Home starts and job levels diverge in Canada and the U.S. (February 8, 2012)
- Canada’s labour market flat in January but U.S. on a roll (February 3, 2012)
- Canada’s labour market flat in January but U.S. on a roll (February 3, 2012)
- More








