LATEST NEWS
Trade Contracting | O H & S | Skills Training | Professional Services
November 25, 2008
Canadian Standards Association
CSA changes 2009 Canadian Electrical Code to align with American counterpart
Future upgrades to the Canadian Electrical Code will help bring the code closer to its American counterpart and incorporate new safety improvements, states the Canadian Standards Association (CSA).
“There will be greater clarity improvements and harmonization (with the new code),” said Stephen Brown, electrotechnical director at CSA.
CSA recently held a webcast and teleconference to highlight new areas in the CSA 2009 Canadian Electrical Code which will undergo upgrades after a little more consultation. The code is considered a “must-have” safety tool and it has now been moved to a three-year production cycle, similar to the American National Electrical Code, noted Brown. Canada’s code was previously in a four-year cycle.
Brown said the stakeholder consultation, which helped develop the changes, was “the most extensive stakeholder consultation ever” undertaken by the CSA.
Utilities, home builders, product manufacturers, designers, installers and government officials were all involved in the process, he said.
The 10 main areas where code upgrades will occur are: requirements for tamper resistant receptacles; passenger ropeway requirements; new bonding requirements for servicing pools; new requirements for primary seals; equipment requirements for certain class and zone hazardous locations; new cable types; motor overload protection requirements; kitchen microwave and range hood hookups; connection of non-mandatory equipment to emergency power supplies; and electrically connected carbon monoxide alarms.
New technology, immediacy for improving electrical hazard safety and alignment with the American code are the primary drivers for the code review.
However, the proposed upgrades will now go through a further stakeholder engagement process across Canada to help gather more input and rank priorities, noted CSA.
Lance Novak, sales vice president at CSA, said that along with the upgrades to the code CSA will also use new support tools to both provide and understand the code. The tools recognize “the best practices and latest in technology”, he said.
“We will offer the standards in a handy mobile device format,” said Novak.
The format allows users to download a software reader and the 2009 code right to their mobile device. The code will also be available on a “Smart Standard” CD-ROM which contains the guide and a handbook.
CSA will offer a conference series on electrical safety which are specifically designed to provide provincial regulatory bodies the opportunity for input on their issues and concerns. Burnaby, Edmonton, Winnipeg, Toronto and Moncton are the sites for the conference series.
Training via e-learning methods through a Web browser will also be available. This feature allows people access to self-training and assessment anytime, from anywhere, said Novak.
| MOST POPULAR STORIES |
- New technology allows concrete to come clean
- Pursuit of LEED could result in professional negligence, insurance executive warns
- Construction moving forward on Ho Chi Minh City tunnel
- Deaths of five immigrant workers changed jobsites forever
- SNC-Lavalin subsidiary Profac under scrutiny over federal contract billing
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 378 projects with a total value of $3,604,490,024 that Reed Construction Data Building Reports reported on yesterday.
$63,800,000 Markham ON Prebid
RESIDENTIAL, RETAIL DEVELOPMENT
$50,000,000 Thorold ON Prebid
$40,000,000 Etobicoke ON Negotiated
| CURRENT STORIES |
- Pride, sadness as Hogg's Hollow memorial unveiled
- Deaths of five immigrant workers changed jobsites forever
- 1960 calamity has parallels to recent swing-stage accident
- ‘Sandhogs’ who perished had diverse personal stories
- British Columbia open shop association takes issue with Burnaby’s ‘fair wage’ policy
- Pursuit of LEED could result in professional negligence, insurance executive warns
- Ontario economic growth expected to beat national average
- Venues decommissioned in Olympic afterglow
- Canadian Construction Association chair bids farewell
- Hogg’s Hollow tragedy changed Ontario’s construction industry
- Wood being considered as preferred building material for federal projects
- ‘Quality product cannot come from cutting corners on safety’
- Grizzly Oil Sands seeks approval for project near Fort McMurray
- Search continues for sustainable architecture
- Seven British Columbia communities sign Wood First agreements
- U.S. construction employment declines in January
- Ottawa unveils plan to cut red tape
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Sub-sector investment spending intentions from Statistics Canada’s latest survey (March 17, 2010)
- A dozen incredible measurement sets on Canada’s changing ethnic mix (March 9, 2010)
- How fragile is recovery around the world? (March 3, 2010)
- More







