DCN ARCHIVES

LATEST NEWS  Professional Services

September 2, 2004

Guide addresses best practices

CCA to produce ‘how-to manual’ for plansrooms

BY PATRICIA WILLIAMS

STAFF WRITER

As a result of copyright infringement complaints and concerns regarding use of digital electronic drawings, the e-construction committee of the Canadian Construction Association (CCA) has decided to produce an information kit for use by plansrooms operated by member associations.

The guide will address best practices related to the use of digital electronic drawings for bidding purposes as well as ensuring the integrity and security of the design drawings.

“Hopefully, this will become a how-to manual,” said Doug Hotston, the CCA’s director of industry technology and trade services and secretary to the e-construction committee.

“Owners will be the main audience for this document.”

Hotston, whose association has endorsed a policy statement on the use of digital electronic information for construction tendering, said CCA would like to see some consistency in the way in which digital files are produced and formatted as well as displayed in electronic plansrooms.

Doug Hotston

“Some owners are getting PDF files from their consultants while others get TIF files,” he said.

“Design professionals are all using different software platforms as well.”

Hotston said CCA also would like to see some consistency in the types of agreements that plansrooms have with owners who deposit their plans for display electronically, dealing with copyright restrictions and the like.

“This has become an issue for a lot of design professionals and provincial (architects’) associations,” Hotston said.

In assembling its kit, the e-construction committee is keeping an eye on consultations being carried out by Public Works and Government Services Canada, a key industry client at the federal level.

The department is looking at developing standard technical procedures.

“In a lot of cases, what they (Public Works) are doing right now is taking hard-copy sets of plans and specifications and scanning them—which is very inefficient,” Hotston said.

“That is how they are generating electronic files.”

That is also the case with Ontario's Ministry of Transportation, which Hotston said “probably has the most robust" electronic tendering system currently on the market.

“They post their drawings and accept bids electronically, but all the drawings are still scanned.”

The committee hopes to have a draft of the kit’s contents completed for discussion at a meeting in Ottawa next month.

Print | Comment

MOST POPULAR STORIES
TODAY’S TOP CONSTRUCTION PROJECTS

These projects have been selected from 544 projects with a total value of $1,665,691,502 that Reed Construction Data Building Reports reported on Tuesday.

HIGH SCHOOL

$44,000,000 Sault Ste Marie ON Tenders

CONDOMINIUM APARTMENT TOWER, RETAIL BUILDING

$40,000,000 Toronto ON Negotiated

RESIDENTIAL DEVELOPMENT, GOLF CLUB

$35,000,000 Newmarket ON Prebid

Daily Top 10

CURRENT STORIES
ALEX’S ECONOMICS BLOG

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.

TODAY’S TOP JOBS

Manager, Standards
Ontario-Toronto

Site Superintendent
Ontario-Toronto

Outside Sales Representative
Alberta-Edmonton

2nd and 3rd Class Power Engineers
Alberta-Athabasca

Flat Roofing Foreman/Estimator
Ontario-Stouffville

Aircraft Inspectors/Maintanance Engineers
Ontario-Toronto

Supervisor
Ontario-Etobicoke

Administrative Assistant
Alberta-Edmonton

Construction Manager
Alberta-Calgary

Project Manager
Ontario-St George Brant

More jobs 

myJobsite.ca

Your gateway to
the top careers
in construction
and design