LATEST NEWS
July 2, 2008
Alberta program launches women into construction careers
90 per cent of grads in trades
A bold Alberta program proves that women can do very well in the trades if they have support when they begin their journey to become journeywomen.
“Women are keen to do the work,” said JudyLynn Archer, CEO of Women Building Futures (WBF), an Edmonton non-profit organization that trains and mentors women to become successful tradespeople.
“Women are keen to learn about the opportunities, but we don’t just wake up and think, ‘I’ll be a boilermaker.’ ”
Speaking at the Canadian Apprenticeship Forum’s 2008 Conference in Victoria, Archer said a perfect storm of retirements and mega-projects resulted in 42,000 new construction workers being hired last year in Canada. While the boom and boomer retirements continue, the need won’t dissipate.
In Alberta, just more than half of the province’s 3.5-million population is female, but women make up about four per cent of the province’s construction and oilfield workforce.
In Canada, in 2005, only 10 per cent of the 294,000 people who registered for apprenticeship training were female.
Meanwhile women, many of them single mothers, are working hard at low-paying jobs and not earning enough to pay the bills, Archer said.
The WBF program targets these women, primarily aged 24-34 and many of them Aboriginal.
But before they can start, the women complete a four-day assessment.
WBF wants women who will show up at work each day and can do the job.
“We don’t want to disappoint the employer,” Archer said.
WBF also doesn’t want to see signs of alcohol or drug abuse or “rockabilly behaviour.” Future welders or carpenters also have to be able to work with men.
Women who pass the assessment go into three streams based on their existing abilities: Journeyman Start (leads to apprenticeship); Boot Camp ( leads to job); Pre-Start Program which feeds into the other two streams.
To ensure the women succeed, the WBF has converted a 30,000-square-foot warehouse it purchased in 2006 into a 50,000-square-foot training and affordable housing facility.
Some women don’t live in permanent housing.
Instead they move from place-to-place. As students, it’s important they get rest and not have to worry about putting a roof over their heads, Archer explained.
The 42 housing units, with 18 of them for single moms and their children, are furnished and fully-outfitted.
Most of the women in the WBF program do not pay for their training or housing, she said.
One further aspect which requires action is child care for the trainees, since it’s the number one reason employers are leery of hiring women. WBF aims to make child care a non-issue, she said.
So far, the program appears to be working.
About 90 per cent of its graduates find and maintain jobs in the trades.
They’re eager to work, detail-oriented, conscientious and happy to be there, Archer said.
Since the WBF’s launch in 1998, more than 60 companies have taken on the program’s 330 students.
| MOST POPULAR STORIES |
- Professional Engineers Ontario unveils new performance standards for demolition
- British Columbia’s construction unions and contractors ratify agreement on drug testing
- Digging deep at Tucker Hi-Rise’s X Condos project
- Deaths of SNC-Lavalin workers in Algeria highlight risks of overseas operations
- Toddglen Construction builds new Neighbourhood on Bloor Street
- 20 Most Popular Stories
| CURRENT STORIES |
- History plays a role in Niagara-on-the-Lake development
- Sawing at St. Gabriel Village in North York, Ontario
- A growing, green biodiesel option
- Guelph, Ontario firm fined $200,000 in worker's death
- Aecon wins $31.5 million Smiths Falls, Ontario hospital contract
- Video Editorial: U.S. trade deficit remains stuck at $700 billion
- Sky-high View in Vancouver
- Plutonic lands GE financial services as P3 partner in B.C. Hydro bid
- New Zealand industry finds estimators in short supply
- Rising temperatures damage infrastructure in Arctic communities
- U.S. resident dies in Alberta collision
- Quebec nuke plant to get $1.9 billion upgrade
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- Industrial Construction is Resource-related (August 28, 2008)
- Construction Starts are Down about One-quarter So Far this Year (August 22, 2008)
- Canada’s Slide in Housing Starts Begins (August 21, 2008)
Lifestyle Blog More 
- What’s Red, Pretty and Prickly? (August 26, 2008)
- What’s Happened to Jokes Isn’t Funny (August 25, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Salter Pilon Architecture Inc. wins contract to design Bradford recreation centre (Aug 22, 2008)
- Shore Tilbe Irwin & Partners begin designs for LEED Silver-compliant community centre (Aug 22, 2008)
- Salter Pilon Architecture nears completion of Georgian Manor working drawings (Aug 22, 2008)
- Town of Markham proposes new LEED-compliant Cathedral Town firehall (Aug 22, 2008)
- Townline Group plans redevelopment of former Fantasy Garden World property (Aug 18, 2008)
