LATEST NEWS
June 11, 2008
CaGBC sets a green example with LEED CI Gold designation for Vancouver office
If you want to change the world, you have to be prepared to show how it can be done.
The Canadian Green Building Council (CaGBC), the national industry organization advancing green building practices and holding the first national summit on green building today and tomorrow, is trying to do just that, most recently through the certification of its Vancouver office as LEED CI Gold.
The council’s intent with the Vancouver office was to showcase what was possible through “green” tenant improvement.
The project was not the largest, by any means, encompassing only about 900 square feet and including four workstations, a private office and a boardroom.
Nancy Grenier, manager of communications and marketing for the CaGBC, says the organization is pleased with the results and the way in which they were received. “The project achieved a total of 32 credits for the use of recycled content in construction materials and office furnishings, FSC certified wood in furniture and millwork, and low VOC-emitting materials in carpeting and workspace structures,” says Grenier.
Credits were also awarded for the installation of Energy-Star appliances, as well as for the use of natural materials from rapidly renewable sources in furniture, countertops, carpeting and upholstery.
As well, waste and indoor air quality management plans were implemented during the construction phase of the project, which helped to reduce the project’s environmental impact on neighbouring suites.
As a continuing commitment to sustainability, the Vancouver office offsets 100 per cent of its electricity use through Green Power Certificates.
The real story however is the effect on a personal level. Grenier says she has noticed many benefits, some expected, others less so.
“The office helps our visitors experience a green space, and it makes for a great discussion starter,” says Grenier. “And, as well, my physical environment is a constant reminder of why I work here — it influences how I think about my work.
“Providing a healthy workplace is also a key point when interviewing new employees.
“I didn’t expect that the open office concept would be so workable. I’ve been working in an individual office for the past 10 years, and I find that with the right people, the open concept can be very energizing and it helps to build and sustain a collaborative approach to my work.”
| MOST POPULAR STORIES |
- Construction moving forward on Ho Chi Minh City tunnel
- Deaths of five immigrant workers changed jobsites forever
- Pride, sadness as Hogg's Hollow memorial unveiled
- St. Marys Cement plant workers go on strike in Bowmanville, Ontario
- ‘Sandhogs’ who perished had diverse personal stories
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 371 projects with a total value of $1,380,346,147 that Reed Construction Data Building Reports reported on yesterday.
MINE, PROCESSING PLANT, TREATMENT BLDGS
$50,000,000 Cochrane Dist ON Prebid
CONDO APARTMENT BLDG, COMMERCIAL OFFICE, RETAIL
$50,000,000 Toronto ON Prebid
EDUCATION BUILDINGS, ADDN ALTS
$40,000,000 Toronto ON Prebid
| CURRENT STORIES |
- Construction Sector Council’s firm-capacity survey to identify challenges
- Pride, sadness as Hogg's Hollow memorial unveiled
- Commemorative quilt gets permanent home
- Getting a lift at iLoft condos in Toronto
- ‘Sandhogs’ who perished had diverse personal stories
- Construction Safety Association of Ontario saluted for pioneering role in provincial health and safety
- Work continues on Mona Lisa Residences in North York, Ontario
- Association of Consulting Engineering Companies campaign targets students
- China to bid on U.S. high-speed rail projects
- Northern Ontario First Nations demand consultation on chromite mining
- Filling labour gap a top priority for incoming Canadian Construction Association chair
- Safety issues raised as Vancouver hires chief electrical inspector
- Buildex Edmonton seminar to examine worksite safety on green building projects
- Canadian Construction Association awards highlight excellence
- Chilliwack Cultural Centre project sets tilt-up concrete record
- Imperial Oil choses Finning International as mining equipment supplier for oilsands project
- BC Hydro awards purchase agreements for 19 clean wind, run-of-river energy projects
- Ledcor continues construction on mixed-use project in Vancouver
- Role of general contractor has evolved over the years
- Alberta Pipe Trades College ready to open the valve on training
- Friction grows between generals and trades during recent downturn
- Green building adding to administrative burden for contractors
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Sub-sector investment spending intentions from Statistics Canada’s latest survey (March 17, 2010)
- A dozen incredible measurement sets on Canada’s changing ethnic mix (March 9, 2010)
- How fragile is recovery around the world? (March 3, 2010)
- More







