LATEST NEWS
March 10, 2008
China turns to canals to meet pressing demand for potable water during Olympic Games
BEIJING
When 16,000 athletes and officials show up this summer, they will be able to turn the taps and get drinkable water — something few Beijing residents ever have enjoyed.
But to keep those taps flowing for the Olympics, the city is draining surrounding regions, depriving poor farmers of water.
Though the Chinese capital’s filthy air makes headlines, water may be its most desperate environmental challenge. Explosive growth combined with a persistent drought mean the city of 17 million people is fast running out of water.
Meanwhile, rainfall has been below average since 1999. The result: Water resources per person are 1/30th of the world average, lower even than Israel.
“To ensure the supply for a short period of time shouldn’t be a problem, but to keep the long-term sustainable use of resources is a challenge,” said Ma Jun, an environmentalist who has written about China’s water issues.
In an attempt to ease the water woes, China has turned to a grand engineering feat. Workers are digging up the countryside south of Beijing for a canal that will bring water from China’s longest river, the Yangtze, and its tributaries to the arid north by 2010.
The first part of the project is being accelerated to meet anticipated demand from Olympic visitors. By April, the canal is to begin bringing 80 billion gallons a year — an amount equal to the annual water use of Tucson, Ariz.— from four reservoirs in nearby Hebei province.
“I think one of the things the Olympics is showing is it’s desperation time and Beijing has the power,” said James Nickum, an expert on Chinese water policy issues at Tokyo Jogakkan College in Japan.
In mountainous Chicheng county, about 110 kilometres northwest of Beijing, dried-out corn stalks stick out of the windblown earth. Farmers limit themselves to two buckets of water a day from icy wells. They are prohibited from tapping what’s left in the local reservoir.
The farmers have been ordered to grow only corn, which requires less water but also fetches a lower price than rice or vegetables.
The government offered about US$30 in compensation, but farmers say not everyone received it. Too poor to buy coal, they carry discarded corn stalks home on their backs for fuel to heat their homes.
“For two years we’ve haven’t used water for rice, because it’s been given to Beijing,” said Yu Zhongxin, 56, of Ciyingzi, a village of small houses deep in the mountains by the Hei river, which feeds Beijing’s main reservoir.
“But the individual interest submits to the state interests,” he said. “I have no objection. I support it for the success of the 2008 Olympics. China must win!”
Sitting on the northeast edge of the arid north China plain, near no major river and 145 kilometres from the sea, Beijing has had water problems for more than a millennium. Sui dynasty emperors built one of the world’s longest canals in the seventh century to bring rice from the fertile south to the capital.
In recent decades, rapid development, intensive agriculture and wealthier lifestyles have both drawn down and polluted the city’s water supply.
“Very few people used toilets in the 1950s, but right now everyone uses toilets, uses showers, uses swimming pools, and fancy buildings use lots of water,” said Dai Qing, a former journalist who has become one of China’s most prominent environmental campaigners.
The last decade has seen the construction of water-guzzling projects across the city from landscaped gardens and artificial lakes to golf courses and parks, many spurred by the Olympics.
“We don’t have water but no one mentions it, all the policy makers never mention that, just develop, develop,” Dai said.
The city has spent around US$3 billion since it won the Olympic bid in 2001. It has built wastewater treatment plants, moved water-intensive industries out of the city and cut down on pesticide and water use by farms. Near its main reservoir, the Miyun, it has closed polluting factories and relocated 15,000 residents to reduce household pollution.
Nearly all Olympic venues and the Olympic Village will use treated wastewater for heating systems and toilets. Recycled wastewater also will irrigate the Olympic Park, which will include a wooded area and an artificial lake.
Associated Press
| MOST POPULAR STORIES |
- Professional Engineers Ontario unveils new performance standards for demolition
- British Columbia’s construction unions and contractors ratify agreement on drug testing
- Digging deep at Tucker Hi-Rise’s X Condos project
- Deaths of SNC-Lavalin workers in Algeria highlight risks of overseas operations
- Toddglen Construction builds new Neighbourhood on Bloor Street
- 20 Most Popular Stories
| CURRENT STORIES |
- Lineup at the Bars in Toronto
- Industry welcomes $1.1 billion investment in infrastructure by Ontario
- Ontario Association of Architects produces client hiring guide
- Macivor moving on from Ontario industry secretariat
- Behind the Post in Etobicoke, Ontario
- Video Editorial: U.S. trade deficit remains stuck at $700 billion
- Integrated Team Solutions is the preferred proponent for Woodstock, Ontario hospital
- GO Transit wraps up Lakeshore expansion job
- Norwegian solar panel firm to build Quebec plant
- Columns installed in London Olympic stadium
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- Industrial Construction is Resource-related (August 28, 2008)
- Construction Starts are Down about One-quarter So Far this Year (August 22, 2008)
- Canada’s Slide in Housing Starts Begins (August 21, 2008)
Lifestyle Blog More 
- What’s Red, Pretty and Prickly? (August 26, 2008)
- What’s Happened to Jokes Isn’t Funny (August 25, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Salter Pilon Architecture Inc. wins contract to design Bradford recreation centre (Aug 22, 2008)
- Shore Tilbe Irwin & Partners begin designs for LEED Silver-compliant community centre (Aug 22, 2008)
- Salter Pilon Architecture nears completion of Georgian Manor working drawings (Aug 22, 2008)
- Town of Markham proposes new LEED-compliant Cathedral Town firehall (Aug 22, 2008)
- Townline Group plans redevelopment of former Fantasy Garden World property (Aug 18, 2008)
